Contech worked closely with HydroScience as the project changed to provide sample layout details and cost estimation. This additional storage provides time for operations staff to respond and take corrective action if a pump system alarm occurs, while containing sewer flows until they can be later pumped.ĭesign considerations such as total required storage, and tank location changed multiple times.
The overflow storage system was included in the project to add contingency storage volume to the existing sewer lift station wet well. A DuroMaxx® Steel Reinforced Polyethylene (SRPE) tank was chosen to address the casino's emergency overflow requirements.
Contech Engineered Solutions, a leading provider of innovative infrastructure solutions, was selected by the project engineer, HydroScience Engineers, to deliver a reliable and durable solution. A critical component of this project was the installation of an emergency overflow storage system that would tie into its existing sanitary sewer lift station. In an effort to enhance its utility infrastructure and ensure the safety of its patrons, the casino management embarked on a utility improvement project. The Red Hawk Casino, located in Placerville, California, is a premier gaming and entertainment destination serving the Sacramento region.